Feeds:
Posts
Comments

Posts Tagged ‘Guangdong Olympic Stadium’

Bird's Eye View of Olympic Green

Beijing’s $500-million Olympic stadium opens its doors to the media. Finishing touches are still being added to the 91000 seat venue.

Bird’s Nest, as it has been nicknamed, cost more than 500 million US Dollars and took fours years to build. It is called ‘Bird’s Nest’ due to the structural form of its roof. The interwoven structural elements of the facade produce a single surface, upon which further elements are arranged in a chaotic manner to blur the distinction between the primary structure and the secondary structure. The roof is saddle-shaped, and the geometry is developed from a base ellipse of which the major and minor axes are 313 meters and 266 meters respectively. The outer surface of the facade is inclined at approximately 13° to the vertical.

(more…)

Read Full Post »